Equipment repair
Worn, eroded and cracked machinery rebuilt and returned to service, typically faster and at lower cost than replacement.
Request a site visit
Rebuilding metal that would otherwise be scrapped
Most rotating and fluid-handling equipment is taken out of service by surface damage while the component is still structurally sound. Erosion and corrosion remove metal from pump casings, impellers, water boxes and tube sheets. Shafts wear at the seal and bearing areas. Housings crack, threads strip and keyways loosen.
We rebuild that lost metal with METALCLAD polymer composites and return the part to its original dimensions. Deep pitting and erosion are filled with METALCLAD CeramAlloy CP+AC paste, then sealed under CeramAlloy CL+AC liquid, which cures to a hard, smooth surface that resists further attack. Mechanical repairs such as worn shafts, oversized bearing housings and stripped threads are made with METALCLAD DurAlloy, which can be machined, drilled and tapped once cured. Where the equipment runs hot, the same work is done with CeramAlloy HTP and CeramAlloy HTL.
Every repair is made cold, so the part keeps its shape and the work needs no hot-work permit. Lead times are measured in hours or days. In one recent case a chiller water box was rebuilt and back at the mill in about 36 hours when a replacement was five to six weeks away. The composite is immune to corrosion, so repaired surfaces usually outlast the original metal, and the same systems are specified as protection for new equipment.
Equipment repair projects


Chiller tube sheet and water box
METALCLAD CeramAlloy CP+AC, then CeramAlloy CL+ACRead the project →

Split-case pump casing
Grit-blasted, rebuilt and coated with METALCLAD CeramAlloySee the product →

Pump impeller
Rebuilt and coated with METALCLAD CeramAlloySee the product →

Piston casings
Rebuilt with METALCLAD DurAlloyRead the project →

Where it is used
Products for equipment repair
METALCLAD CeramAlloy CL+AC
Coats and resurfaces new or repaired components with a ceramic-hard, very smooth finish that improves efficiency.Viscous liquidView product →METALCLAD CeramAlloy CP+AC
Rebuilds deeply corroded or eroded fluid-flow equipment. Cures metal-hard without heat.Trowelable pasteView product →METALCLAD CeramAlloy HTL
The protective coating for elevated-temperature service, applied over CeramAlloy HTP or on new components.Viscous liquidView product →METALCLAD CeramAlloy HTP
The rebuilding paste for equipment that runs at elevated temperatures: boilers, stacks, scrubbers, pump casings.Trowelable pasteView product →METALCLAD DurAlloy
Rebuilds worn shafts, housings, keyways and stripped threads. Once cured it can be drilled, tapped and machined.Non-sag pasteView product →METALCLAD SpeedAlloy
A metal-hard repair in minutes, for equipment that has to go straight back into service.Fast-cure pasteView product →METALCLAD SpeedAlloy QS
The fastest-setting grade. Stops an active leak so that a permanent repair can go over it.Fastest-cure pasteView product →We specify the system after inspecting the equipment or structure and its operating conditions.
Equipment repair in practice

Emergency repair for a paper mill water box
A corroded chiller water box was rebuilt and returned in about 36 hours, at roughly 30% of the cost of a new one.

METALCLAD CeramAlloy CL+AC protects a new vertical pump column headed to an energy plant
A new 6.5-foot-diameter pump column was coated before going into service to protect it from the corrosion that destroyed its predecessor.

Art museum protects critical cooling tower support beams and piping
Two rooftop cooling towers above a museum's galleries had their corroded support beams and piping repaired and protected.
ENECON NorCal projectWinter is the time for cooling tower, chiller and heat exchanger maintenance
Before-and-after examples of cooling equipment repaired ahead of summer.
ENECON NorCal project100-year-old piston casings repaired, protected and making chocolate again
Cracked, century-old piston casings at a Bay Area chocolate factory were rebuilt after other repair attempts had failed.

Full rooftop air handler unit restoration
A badly corroded, leaking air handler on a 19-story coastal building was restored in place.
Schedule a no-cost
site visit