Projects / Equipment repair / January 2024

Winter is the time for cooling tower, chiller and heat exchanger maintenance

Before-and-after examples of cooling equipment repaired ahead of summer.

Corroded cooling tower supply piping
Corroded cooling tower supply piping.

As those in charge of facilities maintenance know, this is the time of year to keep your equipment in optimal operating condition. Winter is the season for maintenance on your cooling towers, heat exchangers, and HVAC equipment to keep things cool and operating efficiently in the summer.

Cooling tower exterior
Cooling tower exterior.

ENECON specializes in helping maintenance managers deal with these critical repair needs, including corrosion, erosion, structural protection, leaking pans and protecting critical pipes that may be corroding. We also offer free no-obligation inspections of your critical equipment.

Corroded strainer and piping at a cooling tower
Corroded strainer and piping at a cooling tower.

Here are a few before and after pictures of equipment we have repaired, not replaced, saving customers significant maintenance dollars.

Corroded flange cover
Corroded flange cover.
Corroded electrical cabinet
Corroded electrical cabinet.
Peeling coating on a cooling tower casing
Peeling coating on a cooling tower casing.
Corroded chiller tube sheet before repair
Corroded chiller tube sheet before repair.

Schedule a no-cost
site visit