Projects / Equipment repair / November 2023

100-year-old piston casings repaired, protected and making chocolate again

Cracked, century-old piston casings at a Bay Area chocolate factory were rebuilt after other repair attempts had failed.

Corroded piston casings before repair
Before
Piston casing bore rebuilt and coated
After

A prestigious Bay Area chocolate factory approached ENECON NorCal to see if we could help repair multi-piston cases that move chocolate for production. Several attempts by other companies to repair these, including cold welding, were unsuccessful.

Casing flange during surface preparation
Casing flange during surface preparation.

These piston casings, vital to production, were originally built in the early 1900s and performed well until the cases recently started cracking. Corrosion and erosion were also taking their tolls. We had never repaired something as specific as this, but the customer decided to give it a try.

Technician rebuilding a casing with METALCLAD DurAlloy
Technician rebuilding a casing with METALCLAD DurAlloy.

After receiving the casings, we got to work. Grit blasting the entire inside and outside provided the proper surface preparation, but also exposed the cracks even more. We then applied METALCLAD DurAlloy, a go-to metal repair solution that cures metal-hard, making sure to press it deep into the casing cracks.

DurAlloy was also used to fill in all of the pitted areas after grit blasting and to leave a smooth surface ready for the final two topcoats of CHEMCLAD GP in white. CHEMCLAD GP will protect the entire case, inside and out, for the coming years of exposure to the warm water on the exterior that helps the chocolate on the inside to move freely.

These piston casings have been put back online and are performing better than ever.

Schedule a no-cost
site visit