Full rooftop air handler unit restoration
A badly corroded, leaking air handler on a 19-story coastal building was restored in place.


This rooftop air handler unit is located on the roof of a 19-story building on the coast. After years in service and exposure to an extreme salt air environment, the unit was suffering from significant corrosion damage.
The air handler's compressor section, coil drain cabinet pan, and air inlet chamber were very corroded and leaking. The building's management was considering replacing the unit, but ENECON was asked first to provide a less expensive solution that would also be a long-term fix. In the end, four solutions working in concert show why the ENECON system of solutions works so well.


The areas to be repaired were mechanically prepared using a hand grinder and were then cleaned. A combination of METALCLAD DurAlloy and sheet metal was used to make necessary repairs to the air inlet chamber of the unit.
FLEXICLAD ER was used on the sheet metal seam joints, and ENECLAD SPS was used to pitch the cabinet pan toward the drain to ensure proper drainage. Finally, CHEMCLAD GP was used to protect all of the internal surfaces from future corrosion.
Management was very happy with the results as well as the considerable cost savings.
Related work

Emergency repair for a paper mill water box
A corroded chiller water box was rebuilt and returned in about 36 hours, at roughly 30% of the cost of a new one.

METALCLAD CeramAlloy CL+AC protects a new vertical pump column headed to an energy plant
A new 6.5-foot-diameter pump column was coated before going into service to protect it from the corrosion that destroyed its predecessor.

Art museum protects critical cooling tower support beams and piping
Two rooftop cooling towers above a museum's galleries had their corroded support beams and piping repaired and protected.
Schedule a no-cost