Chiller repairs save thousands and minimize downtime.
In heat exchanger and cooling tower maintenance season, we are often asked about our chiller repair and protection solutions using METALCLAD CeramAlloy CL+AC (liquid) and METALCLAD CeramAlloy CP+AC (paste). This project shows the process from start to finish.



Surface prep
As always, the first step is addressing the existing corrosion with proper surface prep, manual or grit-blasting depending on environmental requirements. In this case, we grit-blasted the entire surface and started with a single coat of CeramAlloy CL+AC in grey, using CeramAlloy CP+AC in deeply pitted areas where the original surface first needed to be restored.


Second coat
Depending on the extent of repair needed, ENECON's project managers will recommend either two or three coats to provide a custom solution.
ENECON Blue top coat applied over the grey first coat.
Final finish
An ENECON Blue final top coat over the first grey coat allows easier wear detection, helping your maintenance crew know where and when to touch up. With light, periodic maintenance, full restorations become a thing of the past. Meanwhile, fast cure times and easy application allow for minimal downtime, adding further savings compared to other options such as full replacement.


METALCLAD CeramAlloy is as versatile as it is high-performance. With a properly prepared surface, CeramAlloy exhibits superb chemical, corrosion and abrasion resistance, breathing new life into all kinds of machinery and equipment.

Projects in other categories
Schedule a no-cost
site visit





